Services › Manufacturing ERP
Custom manufacturing ERP development in India
A manufacturing ERP ties together materials, work orders, stock, buying and quality records. Dashandots builds custom manufacturing ERP software in India, for factories that have outgrown spreadsheets and a packaged tool. We pick the modules to match the way work moves through your plant.
When does a factory need a custom ERP?
Look at custom development when your current tools cannot keep up with how material moves, how jobs run, or who signs off. Common triggers: job-work that comes back in part loads, a bill of materials (BOM) that changes often, or work-in-progress (WIP) stock you cannot match between stations.
First check whether a ready-made package can do the job through settings alone. Go custom when the gaps that remain are worth the build, the data move and the upkeep. Our ERP development service covers the wider scope, the cost drivers and how we plan integrations.
Illustrative workflow: a goods receipt adds stock. A work order holds it. A job card records what was made. A quality check marks it passed or sent for rework. Dispatch then cuts finished stock. Walk this path to spot missing records and handovers. It is an example to test against, not a client result.
Multi-Level Bill of Materials & Engineering Revisions
Handle sub-assemblies, material options and scrap allowances. Tie each work order to an approved revision, so the operator can see which version applies.
Live Shop-Floor Routing & Job Cards
Issue barcoded work orders and digital job cards. Track cycle times, stage handoffs, machine use and operator output across every work centre, live.
Real-Time Work-in-Progress (WIP) Tracking
Log material issue, transfers and finished output to track where stock sits, how much there is and what it is worth. WIP reports are only as good as the entries behind them.
Batch, Lot & Serial Traceability
Link material batches to the production and dispatch records. When a quality issue shows up, your team can trace it back to the supplier batch or the run that caused it.
Automated Vendor Procurement & PO Flows
Flag what to buy from reorder levels, supplier lead times and the production plan. Send each proposed purchase through the approvals your team needs.
Quality Control (QC) at Each Stage
Make the checks compulsory at goods receipt (GRN), during production and before dispatch. Hold back a failed lot on its own, before anyone releases payment.
Manufacturing ERP for small businesses: BOM, job cards and inventory
We fit each build to the way you produce: make-to-order (MTO), make-to-stock (MTS) or engineer-to-order (ETO). You get the modules your plant uses, and skip the ones it does not.
- Multi-level Bill of Materials (BOM) with phantom assemblies and scrap factors
- Production scheduling with machine capacity planning and bottleneck alerts
- Job card and route sheet generation with QR/barcode scanning support
- Raw material, packaging, consumables, and finished goods inventory control
- Weighbridge integration for bulk raw material intake and automated net-weight capture
- Subcontracting & job-work management (outward material issue, vendor reconciliation, GST job-work annexures)
- Preventive maintenance schedules, breakdown logs, mean time to repair (MTTR) and mean time between failures (MTBF)
- Live job-costing combining actual material consumption, machine hours, and direct labor
- TallyPrime integration and GST-related invoice workflows, subject to interface access and agreed requirements
- Executive plant dashboard showing daily production vs. plan, scrap %, and dispatch backlog
ERP interface example
See our custom ERP interface in action.
Use the ERP demo to talk through screen layout and daily workflow. Confirm the manufacturing modules, hardware links and reports separately. This demo is not a factory case study.
How to compare custom and packaged manufacturing ERP
Judge both options against the same factory workflow, the same data sample and the same list of needs. Features and prices move, so ask for current quotes. A generic per-seat comparison will mislead you.
Licensing & Total Cost of Ownership
Packaged ERP: add up the licence, the setup, the support and the upgrades.
Custom ERP: add up the build, hosting, the data move, support and later changes. No per-user fee does not mean no running cost.
Process Customization
Packaged ERP: test the stock modules and the settings they allow against what you need.
Custom ERP: we build the routing, checks and approval rules you agree to. In return, more of the spec work and testing falls on you.
Ease of Adoption for Floor Workers
For either approach: ask an operator to do a real task on the device they will actually use. Watch the fields, the error messages and the scan accuracy. Then pull the network and see how it recovers. Training and workflow fit matter more than how the screen looks.
How should production job card tracking work?
A job card links a work order to the job being done. Agree up front what the operator must enter: job reference, material issued, workstation, quantity made, quantity rejected and finish time. A supervisor should see at a glance what is pending, running and done. The output logged should then match the stock that moved. Pin down barcode scanning and device needs while you scope the work. Do not assume they are included.
Our 5-step factory implementation roadmap
This example schedule splits the work into five phases. We set real dates after we review the scope and the state of your data. We then plan the switchover, the checks and a fallback, with your factory team in the room.
- Phase 1: Plant audit and process mapping (weeks 1–2): we walk your factory floor. We map goods receipts, BOM structures, scrap patterns and the approvals that hold work up. All of it goes into a written scope document.
- Phase 2: Data design and wireframes (weeks 3–4): we design the database and sketch every screen, for supervisor dashboards and operator phones alike. Your operations team reviews and signs them off.
- Phase 3: Core build (weeks 5–10): we ship every two weeks, covering stock, BOM, purchase orders, job cards and the accounting link. You see working software each fortnight.
- Phase 4: Plant testing and data move (weeks 11–12): we clean and load vendor lists, item masters and opening stock. Operators then test the whole flow under real factory conditions.
- Phase 5: Go-live and close support (week 13 onward): we put it live, stand on site through the switchover, train your staff, and carry on with a support retainer.
Frequently asked questions
The roadmap below is a planning example, not a promise. It shows discovery in weeks 1–2, design in weeks 3–4, build in weeks 5–10, testing and data transfer in weeks 11–12, and go-live from week 13. Your real dates depend on four things: how many modules you need, how clean your data is, which systems we link to, and how long operator testing takes.
We can scope Tally links and GST workflows once we check four things: your Tally version, network access, the data mapping, and whether we can reach the interfaces we need. Then agree which records move in each direction. Agree how errors get handled. Agree how your accounts team checks the results. What we can build depends on those checks.
We can build simple screens for tablets, barcode scanners or phones, one per role. A good operator flow is short: pick the job, then enter quantity, scrap or completion. Test that flow with real operators, on the real devices and the real network, before you sign it off.
Compare the whole cost, not the sticker price. Count the build, licences, data transfer, links to other systems, hosting, training, support and later changes. Dashandots charges no per-user licence for the custom app. You still pay running costs and any third-party charges. Ownership and handover follow the project agreement.
We can review a hardware link once we have the device model, the protocol notes and test access. Send us the details of your weighbridge indicator, programmable logic controller (PLC), printer or gateway. We then check how it connects, how accurate the readings are, and what happens when it fails. Only then does it go into the scope.
Ready to modernize your manufacturing operations?
Tell us your plant size, your worst bottlenecks and the modules you need. We send back a scope and a delivery plan within 48 hours.